国产高潮视频在线观看-国产精品无码一本二本三本色-中文字幕人妻色偷偷久久-可以直接看的无码av

廣州廣電計量檢驗股份有限公司

檢測認證人脈交流通訊錄
  • Volvo VCS 1027,149-GRGT

  • 這真不是您需要的服務(wù)?

     直接提問 | 回首頁搜

  • 對應(yīng)法規(guī):Volvo VCS 1027,149
    CNAS認可項目:是
  • Volvo VCS 1027,149

    Accelerated corrosion test

    Volvo also Refer to this test as ACT -1.

    This standard defines an accelerated corrosion test method to be used in assessing the corrosion resistance of metals in environments where there is a significant influence of chloride ions, mainly as sodium chloride from a marine source or by winter road de-icing salt. It specifies a test procedure to be used in conducting the accelerated corrosion test to simulate atmospheric corrosion conditions in a controlled way.

    The one-week main test cycle is composed of two twelve-hour sub-cycles, one with controlled humidity cycling; sub-cycle 1, the other including salt solution application, sub-cycle 2.

    Sub cycle 1 requires constant conditions at 35°C & 95% RH for 4 h, followed by an increase of temperature to 45°C whilst reducing the humidity to 50% over a 2 hour period. This is followed by constant conditions of 45°C & 50% RH for 4 h, together with a 2 hour period of 35°C & 95%RH. Step 1:4) Temperature decrease from 45°C to 35°C.

    Sub cycle 2 requires spraying with salt solution for 15 mins then keeping the samples at 35°C for 1 h 45 min whilst maintaining a set point of 95% - 99% RH in such a way that the test objects remain wet. These steps are repeated in sequence to give a total period of 6 hours. Drying at 45°C & 50% RH for a 2 hour period followed by a further 2 hour period of 35°C whilst maintaining 95% RH.

    This test is also referred to as a Cyclic Corrosion Test, often abbreviated to CCT.


  • 檢測通手機版

  • 檢測通官方微信

  •  檢測通QQ群